Westpoint Blacktown
TDK Formwork was engaged to form new shear walls to the carpark in strategic locations along with 200mm concrete column encasement of existing columns. TDK offered a full service on the project in regards to design, consultation, engineering, supply and placement of all elements involved in the forming of the new shear walls. Prior to any works commenced on the carpark, TDK installed shore 1000 props around each column on every level, to backprop the structure while works were being done. Strengthening the structure as a whole.